A 500-ton limestone crusher per hour would be a large-scale operation and would require a combination of machinery and equipment to achieve this capacity. Here's a suggested configuration for a 500-ton per hour limestone crushing plant:

Primary crusher: A jaw crusher or a gyratory crusher is typically used as the primary crusher in a limestone crushing plant. The primary crusher should be capable of processing around 600-800 tons per hour (tph) to ensure that the required 500 tph output is achieved.

Secondary crusher: After the primary crusher, a secondary crusher is used to further reduce the particle size of the limestone. A cone crusher or an impact crusher can be used as a secondary crusher. This stage may have a capacity of around 500 tph.

Tertiary crusher: If the final product requires a very small particle size, a tertiary crusher can be added to the process. This could be a vertical shaft impact crusher (VSI) or a high-pressure grinding roll (HPGR). However, this stage is not necessary for a 500-ton per hour plant.

Screening and classification: After each crushing stage, the output should be screened to ensure that the desired particle size is achieved. Vibrating screens or banana screens can be used for this purpose. The screens should be sized and configured to produce the desired product size range.

Conveyor belts: Conveyor belts are required to transport the limestone between the crushers, screens, and other processing equipment. The conveyor belts should be robust and capable of handling the required tonnage.

Dust control and environmental protection: A dust collection system, including dust collectors, air filters, and water sprays, should be in place to minimize dust emissions and ensure compliance with environmental regulations.

Control system: A central control system should be installed to monitor and adjust the operation of the plant, ensuring optimal performance and efficiency.

Please note that the configuration suggested above is just one possible solution for a 500-ton per hour limestone crusher. The exact configuration may vary depending on factors such as the properties of the limestone, the desired product size, and the budget of the project. It is recommended to consult with professional engineers and equipment suppliers to determine the most suitable configuration for a specific project.